|
|
|
Check List on error air conditioning system Johnson Control Basement |
|
| Follow the numbers (1...7) to check that all parameters are correct |
| All equipment is behind this door (floor -2) |
|
Equipment to control: |
Schaltschrank im Installationskeller (floor -2) |
 |
Lüftungsgerät im Installationskeller (floor -2) |
 |
|
|
|